customdesign@batemanfurniture.com Oro-Medonte, Ontario
IGFB
Cost Estimator · Custom Cabinetry

What will it cost? Plan with a real range.


Answer four short questions and see a ballpark range for a custom kitchen, vanity or built-ins, drawn from the projects we build in our Oro-Medonte workshop. It takes about a minute, and the number is yours to keep, no email required.

Established 1983 · Oro-Medonte, Ontario
Bigwin Island cottage kitchen with black island and marble counter by Bateman Fine Cabinetry
01 · Your Project

What are you planning?

Choose everything that applies. Most whole-home and cottage projects include more than one.

02 · Material

Wood and finish

After size, the single biggest influence on cost. Choose the closest match.

03 · The Property

What kind of property is it?

A seasonal building needs different materials and construction to survive the moisture cycle.

04 · The Site

How do we get there?

Water access and island properties change the crew, the sequence and the timeline.

Next Step

Turn the range into a real quote


Send us your estimate and a few details. Briar or one of our designers will be in touch to talk through the project and book a consultation, in person or remotely. Every project is designed and built from the ground up, so the conversation starts with how you live.

Understanding the Number

What Drives the Cost of Custom Cabinetry


Size and layout

The amount of cabinetry is the starting point, but layout matters as much as length. Islands, tall pantry units, corner solutions and appliance panels all add work that a straight run of base cabinets does not.

Species and finish

A painted finish on a stable substrate is the most economical route. Stained hardwoods cost more, and select species such as rift-cut white oak or walnut cost more again, because of the material itself and the care needed to match grain across a room.

The building and the site

Seasonal and lakefront properties need moisture-resistant finishes and construction that allows for movement. Water-access and island sites change how the work is delivered and installed. Both belong in the quote from the start.